|
|
THE ABSTRACT
The optimization of capital outlays for manufacturing and installation of electrolytic cells for aluminium production is following after the technological optimization of magnethydrodinamic stability of the cell. It is possible to execute an estimation of capital outlays on manufacturing of bus system, expenses for the electric power at bus system operation, and, hence, at performance of optimization, by the size of bus system weight, given in a current.
The increase of force of a current on a cell with prebaked anodes results in increase of capital and operational expenses on smelter bus system.
|
|